New Project: Western Sydney University Kingwood

Alerton have been engaged to disconnect the chiller control of the existing Carrier chiller control board with the existing BMS as well as implement metering solution for tenancy. Project works include providing new mech/elec panel, rerouting wiring and replacing old sensors, as well as designing and engineering a new control logic for the plant room […]

New Project: 61 Mary Street

Contracted by Ascot Air Conditioning, Alerton will be providing the BMS upgrade of the building.  This project involves the base building upgrade to a 17 storey tower in the Brisbane CBD. The works include the main entry foyer, foyers on each level, upgrades to terraces, amenity upgrades and AC and electrical upgrades. Alerton are also […]

New Project: Melbourne Grammar School

This project is for the provision of an Aurora BMS for the new Innovation Technology & Science Centre building at the St Kilda Campus of Melbourne Grammar School. The BMS will control and/or monitor secondary chilled water systems, hot water systems, active chilled beams, fan forced trench heating and cooling units as well as HLI […]

New Project: Central Park 1 & 4N

Contracted by Austral Air-conditioning Services, Alerton will be providing the BMS, EMS and In Home displays at Block 1 & 4N at Central Park all sitting on a enterprise level backbone. The job consist of two towers with a common basement that house over 300 residential apartments, 6 levels of office space and 17 level […]

New Project: Chadstone Shopping Centre

Contracted by Quadrant, Alerton has been engaged to fitout floors 2 -5 for Chadstone Shopping centre. The base building BMS is a Niagara System with Alerton controllers integrated into Chadstone Shopping Centre.  The project comprises of 22 x PAC units and 40 x sensor relocates. Due to exceptional project management for the current base building […]

New Project: AMNF 535 Elizabeth St

Contracted by Ellis Air-conditioning, Alerton will be undertaking a base building and integrated tenancy fit out for The Australian Nursing and Midwifery Federation Project (ANMF). 3 levels will form the new ANMF Education Centre and comprise auditorium for seminars and conferences, library/student hub, simulation laboratories and teaching spaces to support member training and education. Level […]

New Project: 8 Nicholson St

Contracted to Ellis Air-conditioning, Alerton will be performing the BMS upgrades and mechanical services for this 18 storey, open plan office building. Part of the base building interior upgrades includes the installation of new chillers to serve the tower floors as well as replacement of the existing BMS to improve the efficiency, monitoring capabilities and […]

New Project: WSU Kingswood Building O Refurbishment

Contracted by FDC Mechanical, Alerton will be completing the BMS at Western Sydney University building O. The job consist of a central plant with a chilled and hot water system serving Fan Coil Units in the field. As part of the contract Alerton will be designing dashboards which will be displayed in the foyer of […]

New Project: Westfield Warringah Mall

Westfield’s Warringah Mall is undergoing a large refurbishment to the centre. Contracted to Climatech, Alerton are providing a new control system for the base building and many of its tenants fit outs. This includes new controls for the chiller system and AHU’s along with sub metering and a range of interfacing to other trades. All […]

New Project: Kuala Lumpur Sports City

Contracted to MRCB, Optergy Malaysia will provide a new BMS and EMS system to regenerate and upgrade the existing the Bukit Jalil National Sports Complex in preparation for the Southeast Asian Games (SEA Games). This two phase development will oversea the retrofitting of the National Stadium, Putra Stadium, Aquatics Centre; the development of high-performance training […]